After the elevator is in position, it can open and close the door manually or automatically.(3) when the elevator stops at a certain floor and waits for passengers, press the external call button of the next floor to open the door automatically to welcome passengers.When the elevator has completed all instructions in the car and there is no external call signal, the elevator should be able to close automatically.Open door button. Press the "open" button on the control panel to open the elevator door during the opening and closing process or before the elevator starts after the door is closed.(7) the lobby on each floor is equipped with up and down call switches (the top floor is only equipped with up and down call switches, and the bottom floor is only equipped with up and down call switches).(8) the direction indicator and the current floor position indicator are installed inside and outside the elevator. There are two kinds of signs in the car and in the lobby on each floor. One is the direction indicator light, used to indicate the up and down running state;When there are multiple inner layer selection commands on the car control panel, the elevator should be able to stop automatically according to the floor order and automatically determine the direction of operation.When the floor selection instruction on the car control panel is different from the direction of the elevator, the elevator should be able to automatically determine the direction of the elevator according to the principle of preemption.The elevator should be able to remember the call signal outside the building during operation, and the elevator should be able to stop automatically one by one in response to the running direction of the call meeting.(13) the elevator is equipped with floor buttons, door opening and closing buttons, alarm bells, electric fans and lighting.The design of trapezoidal diagram can be divided into several steps, and then these steps are combined together to form a complete trapezoidal diagram.There are several situations when an elevator opens and closes:(3) the door opening when the elevator stops automatically.When the elevator is located on a certain floor, the indicator generates a floor signal to control the status of the indicator light.When leaving the floor, the floor signal shall be replaced by the new floor signal.Passengers or drivers can select the floor they want to go to through the operation of 1-6 layer selection buttons on the operation panel in the car.When the passenger or driver calls the elevator outside the hall door, the call signal shall be received and remembered.6. Start the acceleration and stable operation during automatic operationThese modules are programmed in sequence to form a complete ladder diagram.When the PLC control technology is applied to the function of the elevator control system, the following design work must be carried out: use the motor device to make the elevator car rise and fall smoothly, and set switches on each floor. Descending instruction: when the elevator is waiting for guests on the designated floor, the call button of the corresponding floor can be pressed. When the elevator reaches the floor, it opens its doors and waits for passengers to enter. When there is no next command, the elevator will automatically close the door; If the elevator receives multiple up and down instructions, it will be automatically processed according to the floor height and respond in the first time, so as to ensure the effectiveness of the entire operation process. Start the operation, call the ladder number, select the car operation. After reaching the selected level, after leveling the trolley, change the speed level, eliminate the floor selection signal, and complete the open and close operation. PLC program adopts modular design to realize the above functions, such as the registration and cancellation of internal and external instructions, automatic positioning, stratified selection, variable speed, vertical cutting ladder, floor number indication, etc.
电梯就位后,它可以手动或自动打开和关闭门。<br><br>(3)当电梯停在某层等待乘客时,按下下一层的外部呼叫按钮自动开门迎客。<br><br>当电梯完成了轿厢中的所有指令并且没有外部呼叫信号时,电梯应该能够自动关闭。<br><br>开门按钮。在打开和关闭过程中或在门关闭后电梯启动之前,请按控制面板上的“打开”按钮打开电梯门。<br><br>(7) the lobby on each floor is equipped with up and down call switches (the top floor is only equipped with up and down call switches, and the bottom floor is only equipped with up and down call switches).<br><br>(8) the direction indicator and the current floor position indicator are installed inside and outside the elevator. There are two kinds of signs in the car and in the lobby on each floor. One is the direction indicator light, used to indicate the up and down running state;<br><br>When there are multiple inner layer selection commands on the car control panel, the elevator should be able to stop automatically according to the floor order and automatically determine the direction of operation.<br><br>当轿厢控制面板上的楼层选择指令与电梯的方向不同时,电梯应能够根据抢占原理自动确定电梯的方向。<br><br>电梯在运行期间应该能够记住建筑物外部的呼叫信号,并且电梯应该能够响应呼叫会议的运行方向自动地一个一个地停止。<br><br>(13)电梯配有楼层按钮,门开关按钮,警报铃,电风扇和照明设备。<br><br>梯形图的设计可以分为几个步骤,然后将这些步骤组合在一起以形成一个完整的梯形图。<br><br>电梯打开和关闭有以下几种情况:<br><br>(3)电梯自动停止时的门开度。<br><br>当电梯位于某个楼层时,指示灯会生成一个楼层信号,以控制指示灯的状态。<br><br>离开地板时,应将地板信号替换为新的地板信号。<br><br><br><br>乘客或驾驶员可以通过操作面板上的1-6层选择按钮来选择要进入的楼层。<br><br>当乘客或驾驶员在大厅门外呼叫电梯时,应接收并记住呼叫信号。<br><br>6.在自动运行期间开始加速并稳定运行<br><br>这些模块按顺序进行编程,以形成完整的梯形图。<br><br>When the PLC control technology is applied to the function of the elevator control system, the following design work must be carried out: use the motor device to make the elevator car rise and fall smoothly, and set switches on each floor. Descending instruction: when the elevator is waiting for guests on the designated floor, the call button of the corresponding floor can be pressed. When the elevator reaches the floor, it opens its doors and waits for passengers to enter. When there is no next command, the elevator will automatically close the door; If the elevator receives multiple up and down instructions, it will be automatically processed according to the floor height and respond in the first time, so as to ensure the effectiveness of the entire operation process. Start the operation, call the ladder number, select the car operation. After reaching the selected level, after leveling the trolley, change the speed level, eliminate the floor selection signal, and complete the open and close operation. PLC program adopts modular design to realize the above functions, such as the registration and cancellation of internal and external instructions, automatic positioning, stratified selection, variable speed, vertical cutting ladder, floor number indication, etc.
正在翻译中..